The painting and plastering in the sanctuary continues to move at a rapid pace, as does the work in the Serenity building. Though to us, sitting in the sanctuary, the amount of paint work required doesn't seem like a lot, there is a lot of space to cover, and a lot of detail to do.
Since the carpet and pews were removed, the H & P team thought it might be a good idea to install electrical circuitry downstairs to prepare for the eventual move of the sound booth. That way, the work can be done and not disturb the new carpet after it has been installed.
We are still aiming for an end of January return to the sanctuary.
Saturday, January 03, 2009
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment